Navigating Variances: What Architects Need to Know About East End Zoning
- lpshamptons
- Aug 29
- 3 min read
Updated: Aug 30
Designing Within the Rules Without Compromising Vision

Designing a beautiful, functional home in the Hamptons is no small feat. But for architects working in areas like East Hampton, Southampton, Sag Harbor, and beyond, zoning is often just as important as creativity. The truth is, even the most elegant, well-planned designs can hit a wall, literally, if they do not comply with local zoning regulations.
That’s where variances come in. If your design challenges the boundaries of what's allowed under current zoning laws, a variance might be the only path forward. But the process of securing one can be complex, time-consuming, and, if mishandled, disastrous for your timeline and client satisfaction.
What Is a Variance?
A variance is a special approval granted by the Zoning Board of Appeals (ZBA) that allows a project to legally deviate from the existing zoning code. In the Hamptons, zoning codes are detailed and strict, designed to protect open space, preserve character, and control growth. These codes regulate:
Minimum front, side, and rear yard setbacks
Building height and number of stories
Lot coverage, including decks, patios, and pools
Floor area ratio and square footage
Number and type of accessory structures
Even slight departures from these rules require a formal request and a compelling justification.
When a Variance Is Needed
As an architect, you may run into scenarios where a variance becomes necessary, including:
Designing a second-story addition that exceeds height limits
Placing a garage or pool too close to the property line
Trying to build on an undersized or irregular-shaped lot
Expanding the footprint of a home beyond what zoning allows
Building on a nonconforming lot or in a historic district
Adding an accessory dwelling unit on a residential property
In each of these cases, you will need more than just a great design—you’ll need a strategic plan to get approval.
The Variance Process in Suffolk County
Every municipality has its own process, but generally, it includes:
Zoning analysis to determine the nature of the violation
Preparation of formal application with plans, surveys, and legal notices
Submission to the Zoning Board of Appeals
Public notice and hearing, where neighbors can support or oppose the request
Board deliberation and decision, which can include conditions or adjustments
This process can take anywhere from 6 to 16 weeks or longer, depending on the complexity of the request, public feedback, and meeting schedules.
How LPS Helps Architects Through the Process
At Land Planning Services, we work directly with architects across the East End to support and streamline the variance process. Our role is to act as your permitting partner and advocate, allowing you to focus on your design while we focus on approvals.
We:
Conduct detailed zoning analyses to identify any potential variances required before plans are finalized
Provide guidance on how to adjust designs to increase the chance of approval or avoid variances altogether
Prepare and submit complete and compliant variance applications
Draft narratives and justifications that align with local code interpretations
Attend and represent your client at Zoning Board of Appeals hearings
Communicate with town planners and board members on your behalf
Why It Matters
Delays in zoning approvals can derail project timelines and budgets. Worse, a denied variance can send you back to the drawing board, literally. By working with a consultant who understands the nuances of local zoning, you give your design the best possible chance of success.
At LPS, we believe that creativity and compliance are not mutually exclusive. Our job is to support your vision by helping you work smarter within the system, or around it, when needed.
Need a second set of eyes on your plans? Let’s talk before you submit.


Comments