Your Complete Guide to Getting a Building Permit in the Hamptons

  • lpshamptons
  • Aug 22
  • 3 min read

Everything You Need to Know Before You Break Ground


Closeup of approved stamp on paperwork, symbolizing the building permit process for home construction projects in the Hamptons

Getting a building permit in the Hamptons is not a simple one-page form or a quick visit to the town building department. In towns like East Hampton, Southampton, Shelter Island, and Southold, the process is layered, detailed, and strictly enforced. Whether you're building a new home, adding a deck, converting a garage, or installing a pool, you’ll need to go through a structured permit process that protects the environment, ensures public safety, and preserves the community’s character.


If you want to avoid costly delays or rejected applications, it’s essential to understand each step before you begin. This guide outlines the complete process—from planning to permit approval—so you can move forward with confidence.


Step One: Research Your Property and Zoning

Before designing anything, you need to understand what is and isn’t allowed on your specific parcel. Start by researching your property’s:

  • Zoning classification

  • Minimum lot size and setbacks

  • Lot coverage limits

  • Height restrictions

  • Overlay zones (wetlands, historic districts, conservation areas)

Every parcel has its own rules, and even similar-looking lots on the same street may have entirely different zoning conditions. If you skip this step, your entire plan could be rejected later.


Step Two: Order a Current Property Survey

Towns on the East End will not accept outdated surveys. A current survey shows:

  • Accurate property boundaries

  • The location of all existing structures

  • Elevations and topography

  • Setback lines

  • Environmental features like wetlands, slopes, or drainage areas

If your survey is older than a few years or missing required details, you will need to order a new one from a licensed land surveyor.


Step Three: Finalize Architectural Plans

Next, work with an architect or designer to create plans for your project. These must include:

  • Site plans showing proposed changes

  • Elevation drawings

  • Floor plans

  • Drainage or grading plans (if required)

  • Construction details that meet the building code

The more complex your project, the more detail will be required in your plan set. Your architect should coordinate closely with a land use consultant or permit professional to make sure the design fits within local zoning restrictions.


Step Four: Prepare and Submit the Permit Application

Once your plans and documents are ready, you’ll need to complete the town’s official permit application. This typically includes:

  • The permit form itself

  • Sealed architectural drawings and current survey

  • Site plan and zoning calculations

  • Health Department approvals if you’re altering the septic system

  • Signed affidavits from contractors and property owners

  • Payment of application fees

Each town has its own checklist. If one item is missing, your application may be rejected or delayed for weeks. That’s why most property owners hire a permit consultant like Land Planning Services to manage the paperwork and submission process.


Step Five: Town Review and Response

After submission, your application enters the town’s review queue. At this stage:

  • Zoning officials will verify compliance with code

  • Building officials will check for safety and construction standards

  • Environmental agencies may be called in if wetlands or sensitive areas are involved

If everything looks good, your permit is approved. If not, you may receive a list of corrections or required revisions. In some cases, your project may need a variance or special permit, which adds time and additional hearings.


Step Six: Receive Your Permit and Begin Work

Once approved, your permit will be issued and you can legally begin construction. Make sure to:

  • Display the permit visibly on the job site

  • Schedule required inspections throughout the project

  • Maintain copies of approved plans and permit documents on site

Your permit may include conditions such as erosion control, tree protection, or limited construction hours. Failing to follow these conditions can lead to violations or stop work orders.


Step Seven: Inspections and Certificate of Occupancy

After your project is complete, you’ll need to schedule final inspections with the town’s building department. These may include:

  • Structural

  • Electrical

  • Plumbing

  • Fire safety

  • Septic or Health Department

Once all inspections are passed and conditions are met, the town will issue a Certificate of Occupancy or Certificate of Compliance to close out the permit.


How Land Planning Services Can Help

At Land Planning Services, we handle the full permit process for you. We:

  • Research your property’s zoning and identify restrictions

  • Coordinate with your architect or designer to ensure compliance

  • Assemble and submit all paperwork and supporting documents

  • Communicate directly with town officials to keep your application moving

  • Help revise plans if changes are requested

  • Represent you at board meetings if your project needs additional approvals

The Hamptons permitting process is not designed for speed. But with the right team, it can be efficient, stress-free, and successful.


Ready to get started? Contact Land Planning Services today and we’ll walk you through every step of getting your building permit, so you can focus on your project instead of paperwork.