From Survey to Permit: The Full Timeline for Getting Approvals in the Hamptons

  • lpshamptons
  • Nov 11
  • 4 min read

A Step-by-Step Guide to the Permitting Process in East Hampton, Southampton, and Beyond


New home construction in the Hamptons representing the step-by-step permitting process from land survey to final approvals in East Hampton, Southampton, and surrounding towns

If you're planning a construction or renovation project in the Hamptons, you’re probably focused on the exciting parts, design plans, finishes, landscaping, and how it will all come together. But before a single shovel hits the ground, there’s one crucial step that can make or break your project timeline: permits.


In Suffolk County, especially in towns like East Hampton, Southampton, Shelter Island, Southold, and surrounding areas, the permitting process is complex, layered, and heavily regulated. Whether you're building a new home, installing a pool, or adding a guest cottage, you’ll need to work through a formal approval process that includes multiple reviews, inspections, and potentially, public hearings.


So how long does it really take to get a permit in the Hamptons? Let’s walk through the full timeline, from initial property research to final approvals, so you can plan smarter, avoid surprises, and move forward with confidence.


Step 1: Pre-Planning and Property Research

Estimated Time: 1 to 2 weeks

Before any plans are drawn, it's critical to understand the zoning, environmental, and legal restrictions tied to your property. Every parcel on the East End has its own unique parameters, including:

  • Zoning classification and building envelope

  • Setback requirements, lot coverage limits, and height restrictions

  • Proximity to wetlands, coastal erosion zones, or conservation areas

  • Historic overlays or scenic easements

  • Open permits or violations from previous owners

At Land Planning Services, we start with a detailed zoning and code analysis to uncover any red flags that might affect your project. This step helps you and your architect make informed decisions before investing in full drawings or engineering.


Step 2: Current Survey and Site Work

Estimated Time: 2 to 4 weeks (or longer during peak season)

Most towns require a current property survey stamped by a licensed surveyor as part of any permit submission. If your survey is outdated, missing structures, or lacks topographical details, you’ll need to order a new one.


In some cases, additional documents like a grading and drainage plan, soil borings, or wetland delineation may also be required.


We coordinate directly with licensed surveyors and engineers to make sure these documents are accurate, up to date, and tailored to your town’s specific requirements.


Step 3: Design and Plan Finalization

Estimated Time: 2 to 6 weeks depending on complexity

While some homeowners come to us with finalized architectural plans, others begin with conceptual drawings that need to be adjusted based on local code. In either case, this phase includes:

  • Collaboration with your architect to ensure compliance

  • Adjustments to avoid triggering variances

  • Integration of engineering or septic plans if needed

  • Preparation of renderings, elevations, and site plans

We often work hand-in-hand with your design team during this stage to avoid costly revisions down the line.


Step 4: Permit Application Preparation and Submission

Estimated Time: 1 to 2 weeks

Once your documents are complete, we assemble the full permit application package. This typically includes:

  • Completed town permit applications

  • Sealed architectural drawings and surveys

  • Environmental documents (if applicable)

  • Zoning analysis and project narrative

  • Copies of Health Department approvals or septic plans

  • Contractor licenses and insurance certificates

Because every town has its own submission process, formatting standards, and forms, attention to detail is critical. One missing page or incorrect label can delay your submission by weeks.


Step 5: Town Review Process

Estimated Time: 3 to 12 weeks (sometimes longer)

After submission, the permit enters the town review queue. The timeline can vary dramatically depending on:

  • The time of year (summer months tend to be busiest)

  • The complexity of your project

  • Whether the project complies with all code or requires additional approvals

  • The town’s current staffing and caseload

  • Whether the project is located in a special zone (wetlands, historic, scenic)

If a variance or special permit is required, your project will need to be reviewed by the Zoning Board of Appeals (ZBA) or Planning Board, which adds time and requires public hearings.


During this period, we stay in close communication with town officials and provide any supplemental documentation they request to avoid unnecessary hold-ups.


Step 6: Revisions or Corrections (if requested)

Estimated Time: 1 to 3 weeks

Sometimes, the town will request changes to your plans or additional information before they can issue a permit. This could include:

  • Reducing lot coverage

  • Adjusting the location of a structure to comply with setbacks

  • Submitting a revised survey or updated drainage report

  • Providing contractor credentials or product specifications

We work with you and your design team to turn around these changes quickly and get your application back into the approval queue.


Step 7: Permit Issuance

Estimated Time: 1 to 2 days (after final review is complete)

Once everything is approved, the building department will issue your permit. At this point, construction may legally begin, but don’t forget, you’ll need to post your permit visibly on site and schedule required inspections throughout the build.


Step 8: Final Inspections and Certificate of Occupancy

Estimated Time: 1 to 4 weeks after construction is complete

Once construction is finished, your project must pass final inspections in order to receive a Certificate of Occupancy (CO) or Certificate of Compliance (CC). These inspections may include:

  • Building

  • Plumbing

  • Electrical

  • Fire safety

  • Health Department or septic

  • Environmental compliance

We coordinate all inspections and make sure any punch-list items are addressed so you can receive your final approvals and close out the project successfully.


Total Estimated Timeline (Start to Finish)

  • Minor renovations or small accessory structures: 6 to 10 weeks

  • Mid-sized additions or pool installations: 10 to 16 weeks

  • New home construction or complex projects: 16 to 24+ weeks

These timelines are based on smooth processing, which is why having a professional team like LPS managing your permitting process can make all the difference.


Let LPS Take the Lead

At Land Planning Services, we manage the entire permitting process from start to finish. We know the ins and outs of each town’s code, we have strong relationships with local officials, and we understand how to keep your project moving forward with minimal disruption.


Whether you're just starting to explore a property or ready to break ground, we can help you map out every step from survey to final sign-off.


Ready to get started? Contact LPS today for expert permitting support in the Hamptons.