How Long Does It Take to Get a Permit in Suffolk County?
- lpshamptons
- Sep 2
- 4 min read
A Detailed Look at the Timeline for Building Permits, Renovation Approvals, and Variances Across the Hamptons

One of the most common questions we hear at Land Planning Services is: “How long is this going to take?”
If you’re planning a renovation, addition, new construction, or pool installation in Suffolk County, especially on the East End in municipalities like East Hampton, Southampton, or Sag Harbor, you need to understand how long the permitting process takes, because it will directly impact your overall project timeline and budget.
The short answer is: it depends. The long answer? That’s what this guide is for.
Why Permitting Takes Time in the Hamptons
Permitting isn’t just filling out a form and waiting for a stamp. In Suffolk County, and especially in the Hamptons, the process is layered with checks, reviews, and approvals designed to protect the environment, preserve neighborhood character, and ensure all construction follows strict safety and zoning codes.
Factors that affect how long your permit takes include:
The size and complexity of your project
The specific municipality and zoning district your property is in
Whether you need a variance or special permit
The current season and review volume
Whether your property is located near wetlands, dunes, or protected areas
The completeness and accuracy of your submission
Whether you need board approval, such as from the Zoning Board of Appeals (ZBA)
Average Permit Timelines by Project Type
Here’s a general breakdown of what to expect, assuming all documentation is complete and no unexpected issues arise:
Small Projects (2 to 6 weeks)
Interior renovations with no structural changes
Replacing windows, roofing, or siding
Installing fencing, sheds under a certain size, or minor landscape elements
Updating bathrooms or kitchens (non-structural)
Medium-Sized Projects (6 to 12 weeks)
Decks and porches
Pools, patios, and pool houses
Small additions or detached garages
Interior renovations with structural or utility changes
Major Projects (12 to 24 weeks or longer)
New home construction
Substantial additions or accessory dwellings
Projects requiring Board of Health or DEC review
Any project needing a variance, wetlands permit, or special use permit
These are just estimates. Some projects move faster, but many take longer, especially if your submission is missing key documents, or if your project pushes the limits of local zoning code.
Where Delays Happen Most Often
Incomplete applications: A missing survey, expired plans, or incorrect forms will get you kicked back to the beginning.
Variance requirements: If your project violates zoning (e.g., setbacks or lot coverage), a variance will extend your timeline significantly.
Environmental review: If your property is within 150 to 300 feet of a wetland, dune, or protected area, you may require additional approvals from the town or NYS Department of Environmental Conservation.
Public hearings: Projects that require ZBA or Planning Board review must be scheduled on the town’s hearing calendar, which may be booked months in advance.
Backlogs: Summer season brings a flood of applications, often creating slower response times across the board.
How to Speed Things Up
The biggest factor in your control is submitting a clean, complete, and fully compliant application the first time. That means:
A current, certified survey of the property
Architect-stamped plans that follow town guidelines
Detailed zoning analysis and supporting materials
Proper formatting, page order, and labeling
Required forms signed and notarized
Contractor information, licenses, and insurance
Coordination with the Health Department, where necessary
This is exactly what we handle at Land Planning Services, because we’ve seen how much time can be saved when the application is prepared professionally from the start.
How LPS Streamlines the Permit Timeline
At Land Planning Services, we don’t just fill out paperwork, we manage the entire permitting process to prevent unnecessary delays and keep your project moving forward.
Here’s how we help:
Zoning and code review: We identify problems early, before plans are finalized.
Document preparation: We make sure every form, plan, and supplemental document meets your town’s requirements.
Agency coordination: We work directly with building departments, planning boards, and environmental agencies to avoid bottlenecks.
Variance support: If your project needs a variance, we handle the application, hearing preparation, and board presentation.
Application tracking: We follow up regularly with town officials, respond to comments quickly, and keep you informed every step of the way.
When Should You Start the Permit Process?
As early as possible. If you’re planning to start construction in the spring or summer, you should begin the permitting process in the fall or early winter. This gives you time to resolve any zoning issues, make plan adjustments, and avoid seasonal slowdowns.
If you’re buying a property and hope to build or expand right away, we recommend scheduling a zoning consultation before closing so you know what’s realistically allowed and how long approvals will take.
Need a Realistic Timeline for Your Project?
Every property and every township is different. If you want a personalized estimate based on your project scope, location, and time of year, contact Land Planning Services today. We’ll review your goals, identify potential holdups, and give you a step-by-step plan for getting your approvals as quickly and efficiently as possible.